Current Projects
Our Solar Footprint Is Growing One Project at a Time
CNH Industrial – Phase One
A 400 kW, 1000-panel ‘behind the meter’ installation whereby all the electrical energy produced is used on site.
CNH Industrial – Phase Two
A 392 kW DC expansion to our existing installation at the CNH Industrial plant in Saskatoon.

Ness Creek Festival Site
A 132-panel, 44.88-kilowatt ground-mount solar power system at the Ness Creek Festival site.

Haskamp Street Project
An 80-panel 22.4-kilowatt rooftop solar system in partnership with Montgomery Agencies.
Our 10 Year Impact:
(estimated, as of February 2026)
Calculation source: SaskPower 2024-25 Annual Report, NSBA Carbon Calculator
Since launching our first solar array at The Two Twenty in 2016, SES Solar Co-op has expanded to include over 10 major installations across the province, including CNH Industrial (Phases I & II), Radiance Cohousing, and the City of Saskatoon Landfill Gas Project. Together, these projects generate more than 500 kW of clean energy, offsetting over 700 tonnes of greenhouse gas emissions annually.
Each site is a testament to what community ownership can achieve. Explore our interactive map to see how our members are building a brighter, low-carbon future.






