Current Projects
Our Solar Footprint Is Growing One Project at a Time
CNH Industrial – Phase One
A 400 kW, 1000-panel ‘behind the meter’ installation whereby all the electrical energy produced is used on site.
CNH Industrial – Phase Two
A 392 kW DC expansion to our existing installation at the CNH Industrial plant in Saskatoon.

Ness Creek Festival Site
A 132-panel, 44.88-kilowatt ground-mount solar power system at the Ness Creek Festival site.

Haskamp Street Project
An 80-panel 22.4-kilowatt rooftop solar system in partnership with Montgomery Agencies.
Our 10 Year Impact:
(estimated, as of February 2026)
Calculation source: SaskPower 2024-25 Annual Report, NSBA Carbon Calculator
Since launching our first solar array at The Two Twenty in 2016, SES Solar Co-op has expanded to include 9 installations across the province, including CNH Industrial (Phases I & II), Radiance Cohousing, and the City of Saskatoon Landfill Gas Project and our latest project at Affinity Credit Union on 8th Street East in Saskatoon. Together, these projects have a generating capacity of more than 900 kW of clean energy, allowing us to offsetting over 700 tonnes of greenhouse gas emissions annually.
Each site is a testament to what community ownership can achieve. Explore our interactive map to see how our members are building a brighter, low-carbon future.






